I was just checking out the auto-pilot in a club‘s Debonair today. It is an STEC-50. You switch it to test and it runs through the test sequence pretty quickly and properly.
You then switch it to operate and the manual says it can take up to 3 minutes to be ready. Why does this process take so long?
You then switch it to operate and the manual says it can take up to 3 minutes to be ready. Why does this process take so long?